Menu
Contact info
Email:
info@brms.ir
info@brmsinstruments.com
Tel: +98 21 22823360
22823340
22823353
22823363
Fax: +98 21 22823393
No. | Projrct’s name | Employer | Consultant | Constructor | Year |
1 | Dasht e Abbas Water transmission tunnel (Katkhah dam) | Iran’s Water and power resources development Bureau | Mahab e Ghods Consultants | Rah e Sahel Org. | 1996 |
2 | Water diversion and transmission tunnels (Aidighmush dam) | Ardabil and East Azarbayejan Water Bureau | Bandab Consultants | Sepano Engineering Co. | 1996 |
3 | Water diversion and transmission tunnels (Gharanghu dam) | Ardabil and East Azarbayejan Water Bureau | Bandab Consultants | Sab Engineering Co. | 1996 |
4 | Water diversion tunnel (Mamlu dam) | Tehran Water Bureau | Lar Consultants | Melli sakhtoman Co. | 1997 |
5 | Izadkhast dam | Fars Water Bureau | Parab Fars Consultants | Katra Engineering Co. | 1997 |
6 | Syvand dam | Fars Water Bureau | Sakku Consultants | Pars Garma Engineering Co. | 1997 |
7 | Resalat freeway tunnel | Tehran Municipality office | Kuhrang tunnel Consultants | Perlit Engineering Co. | 1997 |
8 | Water diversion tunnel (Meijaran dam) | Mazandaran Water Bureau | Tehran Sahab Consultants | Katra Engineering Co. | 1998 |
9 | Kandowan road tunnel | Ministry of Road and Transportation | Sharif industrial University | Road development Org. | 1998 |
10 | Masjid e Soleiman dam | Iran’s Water and power resources development Bureau | Moshanir Consultants | Daelim Engineering Co. | 1998 |
11 | Lar dam (Repair and replacement of monitoring instruments) | Tehran Water Bureau | BRMS | BRMS | 1998 |
12 | Taloon Tunnel (Tehran-Caspean Sea Highway) | Tehran-Caspean Sea Highway Company | Laniz Engineering Company | Melli sakhtoman Co. | 1999 |
13 | Esteghlal dam (Minab) | Minab Water Bureau | BRMS | BRMS | 1999 |
14 | Cheshmeh Langan Water transmission tunnel | Isfahan Water Bureau | Zayandab Consultants | Separ Sang Engineering Co. | 1999 |
15 | Kuhrang 3 Water Transmission tunnel | Isfahan Water Bureau | Zayandab Consultants | Tablieh Engineering Co. | 1999 |
16 | Zawin Concrete dam | Khorasan Water Bureau | Abpuy Consultants | Jahad Nasr e Khorasan | 2000 |
17 | Khomari Railway tunnel (Mashhad-Bafq railway route) | Islamic Republic of Iran Railway Co. | Iran Oston Consultants | Rasa Engineering Co. | 2001 |
18 | Pedeh Railway tunnel (Mashhad-Bafq railway route) | Islamic Republic of Iran Railway Co. | Iran Oston Consultants | Canivo Engineering Co. | 2001 |
19 | Emamzadah Hashem Road tunnel | Ministry of Road and Transportation | Iran Oston Consultants | Hara Organization | 2002 |
20 | Shi kalak dam | Sistan & Baluchestan Water Bureau | Ab o Khak Resources Consultants | Power civil and production Engineering Co. | 2002 |
21 | Tehran Subway (N2 Station) | Metro Company | Hegza Consultants | Absa Engineering Co. | 2002 |
22 | Ghomrud Water Transmission Tunnel (Section-2) | Tehran Water Bureau | Mahab e Ghods Consultants | Stratus International Co. | 2002 |
23 | Siah Bisheh control dams project | Iran’s Water and power resources development Bureau | Moshanir Consultants | Melli sakhtoman Co. | 2002 |
24 | Tehran Subway (Nezam Abad Station) | Metro Company | Khawar tunnel Consultants | Soil Mevhanics Services Company | 2002 |
25 | Rock Mechanics Laboratory | Amirkabir University of Technology | Vice Research Dean | Dr. Kazem Najm | 2002 |
26 | Farnagh earth dam (Arak) | Arak Water Bureau | Jamea Iran Consultants | Kawah Rah Engineering Co. | 2003 |
27 | PC2 Cliff (Dez dam) | Khuzestan water and Electricity Bureau | Moshanir Consultants | Noufan Engineering Co. | 2003 |
28 | Shahid Rajaee port Development plan | Ports and shipping Organization | Harlcrow & Hosconing | Makkin Org. Khatamolanbia Org. | 2004 |
29 | Korit Concrete dam (Tabas) | Yazd water Bureau | Abpuy Consultants | Evyol Engineering Co. | 2004 |
30 | Nahrain Earth dam (Tabas) | Yazd water Bureau | Abpuy Consultants | Evyol Engineering Co. | 2004 |
31 | Shahid Mofatteh Powerplant (Hamadan) | Bakhtar Regional Electricity Bureau | Moshanir Consultants | BRMS | 2005 |
32 | Kaka Reza Water Transmission Tunnel | Lorestan Water Bureau | Abdan Faraz Consultants | Melli Sakhtoman Engineering Co. | 2005 |
33 | Turah railway Tunnel (Iran Western Railway) | Railway Construction and Development Bureau | Rahab Consultants | Rahsazi Iran Engineering Co. | 2006 |
34 | Turah railway Lope-63 (Iran Western Railway) | Railway Construction and Development Bureau | Rahab Consultants | Rahsazi Iran Engineering Co. | 2006 |
35 | Isfahan Shraz Railway line (Section-5 tunnels) | Railway Construction and Development Bureau | Tirazh Engineering Co. | Botonpash Co. | 2006 |
36 | Masjid e Soleiman dam | Khuzestan water and Electricity Bureau | BRMS | BRMS | 2006 |
37 | Shebli Road Tunnel (Zanjan-Tabriz Highway) | Ministry of Road and Transportation | Iran Oston Consultants | General Mechanics Engineering Co. | 2007 |
No. | Projrct’s name | Type of instruments used |
1 | Dasht e Abbas Water transmission tunnel (Katkhah dam) | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Hydraulic Load cell for Anchors (Mechanical Readout) 3- Convergence meter Convergence pins |
2 | Water diversion and transmission tunnels (Aidighmush dam) | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Convergence meter Convergence pins |
3 | Water diversion and transmission tunnels (Gharanghu dam) | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) Hydraulic load cell for Anchors |
4 | Water diversion tunnel (Mamlu dam) | 1- Convergence meter Convergence pins |
5 | Izadkhast dam | 1- Borehole water level indicator (dipmeter) 2- Dam Reservoir water level indicator (with electric floater) 3- “V” notch weirs Electrical water level indicator for “V” notch weirs |
6 | Syvand dam | 1- Borehole water level indicator (dipmeter) 2- “V” notch weirs Electrical water level indicator for “V” notch weirs |
7 | Resalat freeway tunnel | 1- 4-point (2.8, 5.3, 6.8 & 7.8 m.) borehole extensometers (Mechanical Readout) 2- 5-point (10.5, 20.0, 30.0, 33,0 & 34.5 m.) borehole extensometers (Mechanical Readout) 8-point (7.0, 13.0, 18.0 21.0 22.5, 26.5 32.0 & 38.0 m.) borehole extensometers (Mechanical Readout) |
8 | Water diversion tunnel (Meijaran dam) | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Convergence meter Convergence pins |
9 | Kandowan road tunnel | 1- Convergence meter Convergence pins |
10 | Masjid e Soleiman dam | 1- Frequency type settlement probe 2- “V” notch weir (Inox Steel, dimensions 1500 × 800 mm2) 3- Slotted observation well PVC pipes Calibration frame for Inclinometer probe |
11 | Lar dam (Repair and replacement of monitoring instruments) | 1- Repair and calibration of inclinemeter probe and replacement of cable 2- Borehole water level indicator (dipmeter) Magnetic settlement probe |
12 | Taloon Tunnel (Tehran-Caspean Sea Highway) | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Convergence meter Convergence pins |
13 | Esteghlal dam (Minab) | 1- dam reservoir water level meter (with electric floater) 2- Control system for automatic operation of dam outlets Observation water level cleaner with water jet system |
14 | Cheshmeh Langan Water transmission tunnel | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Convergence meter Convergence pins |
15 | Kuhrang 3 Water Transmission tunnel | 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) |
16 | Zawin Concrete dam | 1- 2 and 4-point borehole extensometers (Electrical Readout) 2- Electric concrete embeded jointmeters 3- Electric concrete embedded strain gauge 4- Air and water thermometers 5- Electric piezometers 6- Standpipe piezometers 7- Observation well piezometer assembly 8- Direct pendulum (electric readout) 9- Inverse pendulum (electric readout) 10- “V” notch weirs 11- Local and central readout syatem (NOTEBOOK) Central readout system (control room) |
17 | Khomari Railway tunnel (Mashhad-Bafq railway route) | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Convergence meter Convergence pins |
18 | Pedeh Railway tunnel (Mashhad-Bafq railway route) | 1- Convergence meter Convergence pins |
19 | Emamzadah Hashem Road tunnel | 1- 3-point (1.5, 3.0 & 6.0 m.) borehole extensometers (Mechanical Readout) 2- Convergence meter 3- Convergence pins 4- Shotcrete stress cells Hydraulic load cells for anchors |
20 | Shi kalak dam | 1- Observation well piezometric assembly Mechanical 3-D jointmeters |
21 | Tehran Subway (N2 Station) | 1- 30 m. Convergence meter Convergence pins |
22 | Ghomrud Water Transmission Tunnel (Section-2) | 1- Convergence meter Convergence pins |
23 | Siah Bisheh control dams project | 1- Convergence meter Convergence pins |
24 | Tehran Subway (Nezam Abad Station) | Convergence meter |
25 | Rock Mechanics Laboratory | 1- 2-D Physical model testing machine for tunnels, slopes, dams, etc. (100 tonnes), for the first time in Iran Automatic 60 channels (10 load cells, 10 LVDT and 40 strain gauges) data logger |
26 | Farnagh earth dam (Arak) | 1- Casagrande piezometer 2- Borehole water level indicator (dipmeter) 3- Magnetic settlement assembly (probe, pipes, reference and target pates, etc.) 4- “V” notch weir
|
27 | PC2 Cliff (Dez dam) | 1- Electrical 3-D jointemeters 2- 100 tonnes Electro-hydraulic load cell for Tandons Local and central readout system |
28 | Shahid Rajaee port Development plan | 1- Electric piezometers Portable readout system for electric piezometers |
29 | Korit Concrete dam (Tabas) | 3- Extensometer fibre glass rods Concrete embedded electric thermometers |
30 | Nahrain Earth dam (Tabas) | 1- Electric piezometers 2- Portable readout system for electric piezometers Portable readout system for concrete thermometers |
31 | Shahid Mofatteh Powerplant (Hamadan) | 1- Extensometer bibre glass rods and polyamide sleeves. Magnetic settlement plates. |
32 | Kaka Reza Water Transmission Tunnel | 1- 8 points (5.0, 20.0, 50.0 & 70.0 m.) borehole extensometer (mechanical readout) Magnetic settlement assembly (pipes, reference and target plates for installation in 120 mm Ø, 75 m. deep borehole). |
33 | Turah railway Tunnel (Iran Western Railway) | 1- Convergence meter 2- Convergence pins Hydraulic load cells for anchors. |
34 | Turah railway Lope-63 (Iran Western Railway) | Mechanical 3-D jointmeters (with mechanical readout system, made on the site) |
35 | Isfahan Shraz Railway line (Section-5 tunnels) | Convergencmeter |
36 | Masjid e Soleiman dam | Magnetic settlemet probe assembly |
37 | Shebli Road Tunnel (Zanjan-Tabriz Highway) | 1- 4-point (1.0, 2.5, 4.0 & 5.5 m.) borehole extensometers (Mechanical Readout) 2- 6-point (1.0, 2.5, 4.0, 5.5, 6.5 & 9.0 m.) borehole extensometers (Mechanical Readout) 3- Convergence meter 4- Convergence pins Shotcrete stress cells |
No. | Project | Employer | Service offered by BRMS | year |
1 | Keshwar tunnel (Tehran-Ahwaz Railway Route) | Islamic republic of Iran Railway lines | Stability analysis and suggestion for stabilizing overlying the tunnel | 1987 |
2 | Karun 3 dam and power plant complex | Sabir Water Works Engineering Co. | Installation of monitoring instruments, Interpretation of monitoring data and stability analysis of water diversion tunnel no. 1 | 1996 |
3 | Karun 3 dam and power plant complex | Sabir Water Works Engineering Co. | Installation of monitoring instruments, Interpretation of monitoring data and stability analysis of powerhouse cavern | 1996 |
4 | Karun 3 dam and power plant complex | Sabir Water Works Engineering Co. | Installation of monitoring instruments, Interpretation of monitoring data and stability analysis of G2M slope, overlying takeoff yard | 1996 |
5 | Masjid e Soleiman dam | Daelim Engineering Co. | Modification of blasting pattern tp avoid overbreaks in powerhouse intakes | 1996 |
6 | Monitroing instruments in Tehran dams | Tehran Water Bureau | Evaluation and report on operation quality of monitoring instruments of Tehran dams | 1999 |
7 | Utilizing and calibration of elastimeter 100 | Azmunah Fulad Co. | Installation and calibration of elestometer instruments with training the personnel. | 1999 |
8 | Taloon Tunnel (Tehran-Caspean sea Highway project) | Laniz Engineering Co. | Installation of monitoring instruments and processing and interpretation of monitoring data | 1999 |
9 | Emamzadah Hashem Road tunnel no. 1 | Hara Org. | Installation of monitoring instruments and processing and interpretation of monitored data | 2001 |
10 | Khomari Railway tunnel (Mashhad-Bafq Railway line) | Rasa Engineering Co.. | Installation of monitoring instruments and processing and interpretation of monitored data | 2001 |
11 | Pedeh Railway tunnel (Mashhad-Bafq Railway line) | Canivo Engineering Co. | Installation of monitoring instruments and processing and interpretation of monitored data | 2002 |
12 | Stability analysis of Shahid Yaaghubi dam | Khorasan Water Bureau | Processing and interpretation of installed monitoring instruments. Evaluation of quality of functioning the installed instruments, back analysis of monitored data and and stability analysis on the dam. | 2002 |
13 | Pedeh tunnel no. 3 (Mashhad-Bafq Railway line) | Canivo Engineering Co. | Design and control of tunnel benching and stabilizing the unstable collapsed part of the tunnel. | 2003 |
14 | Monitoring services of Nahrain dam | Yazd Water Bureau | Installation, reading, processing and interpretation of monitored data for Nahrain dam (Tabas) | 2004 |
15 | Monitoring services of Korit dam | Yazd Water Bureau | Installation, reading, processing and interpretation of monitored data for Korit dam (Tabas) | 2004 |
16 | Mahshahr petroleum export harbor | BRMS | Repair and maintenance of monitoring instruments of Mahshahr petroleum export harbor | 2006 |
17 | Shahid Mofatteh Poer plant | Bakhtar Regional Electricity Bureau | Providing and installation of monitoring instruments, for monitoring ground subsidence. | 2006 |
18 | Kakareza wter transmission tunnel | Melli sakhtoman Engineering Co. | Providing and installation of monitoring instruments, for monitoring tunnel stability | 2006 |
19 | Isfahan-Shiraz Railway route (Section-3) | Iran Oston Consultants | Installation of monitoring instruments, for monitoring tunnel stability | 2007 |
20 | Iran Western Railway route (Section-2) | Rahsazi e Iran Engineering Co. | Providing, Installation of monitoring instruments, for monitoring tunnel stability | 2007 |
21 | instrumentation and monitoring road and railway bridges | Transportation Research institute – Ministry of Road and Transportation | Formulation of Guidelines for instrumentation and monitoring road and railway bridges in Iran | 2007 |
22 | Shebli highway tunnel (zanjan-Tabriz Highway) | General Mechanics Engineering Co. | Providing and installation of monitoring instruments, for monitoring tunnel stability | 2007 |
Email:
info@brms.ir
info@brmsinstruments.com
Tel: +98 21 22823360
22823340
22823353
22823363
Fax: +98 21 22823393